In general, The infrastructure
facility of the zone have reached the standard
of "six through and one flat" - Power
supply, communication, road, water suppy, heat
supply and flat ground.
Power:
The zone has set up an 110kv transformer
substation and spanned 10kv double circle specialized
transmission line.
Communication:
The zone has set up a line of photoconduction
cable, with the capability of installation of
6000 programmed telephones, and one Model 512
terminal, which solve the problem of volume update,
so the zone can directly meet the services on
international and national tel. and fax.
Water supply:
The water factory in Hudong Part can
supply at least 40 thousand tons of water per
day; The Southen City Part is near the water resource
of South Datong City, the water resource there
is also very rich.
Drainage
A sewage plant that can dispose 50
thousand tons sewage a day is setting up, and
the pipeline networks for rain and sewage is paving.
Heat supply
First phase 20 tons centralized heating
and steam supply system has been finished.
Roads
The frames of "six vertical and
five horizon" are finished.
|